Take frame # and divide it by the frame rate used in your export (I do not know what that was). For example, if your Frames/sec was 29.97, 8288 / 29.97 ~= 276.5 seconds. Now, you need to go roughly to that location in the timeline, which is about 00:04:36;15 (4 minutes, 36.5 seconds).